{"id":5635,"date":"2020-07-28T11:55:04","date_gmt":"2020-07-28T09:55:04","guid":{"rendered":"https:\/\/www.hbm.hu\/offer\/high-board-over-the-danube-a-giant-diving-board-on-batthyany-square\/"},"modified":"2020-07-31T18:17:01","modified_gmt":"2020-07-31T16:17:01","slug":"high-board-over-the-danube-a-giant-diving-board-on-batthyany-square","status":"publish","type":"avada_portfolio","link":"https:\/\/www.hbm.hu\/en\/offer-portfolio\/high-board-over-the-danube-a-giant-diving-board-on-batthyany-square\/","title":{"rendered":"High board over the Danube \u2013 A giant diving board on Batthy\u00e1ny Square"},"content":{"rendered":"
One of the most spectacular venues of the 2017 Budapest World Water Championships was created with the involvement of our experts. We were the ones who carried out the piling works of the 65-ton steel diving board set up on Batthy\u00e1ny Square overlooking the Danube. The structure and the pool below were built onto a 17×47 meter reinforced concrete foundation in the riverbed. The work had to be performed from barges anchored on the Danube which was also hampered by the sudden flooding too. With the support of Soletanche Bachy\u2019s French engineers, the substructure of the tower was completed in time, following a 24-hour work schedule.<\/p>\n<\/div>
Customer:<\/u><\/strong><\/p>\n Public sector<\/p>\n <\/p>\n<\/div> Contractor:<\/u><\/strong><\/p>\n HSP H\u00edd\u00e9p\u00edt\u0151 Speci\u00e1l \u00c9p\u00edt\u0151ipari Kft.<\/p>\n<\/div> Date of assignment:<\/u><\/strong><\/p>\n 2017.<\/p>\n<\/div> Applied technology:<\/u><\/strong><\/p>\n Bored pile supported by slurry, Jet-Grouting<\/p>\n<\/div><\/div><\/div> Related projects<\/p><\/h2><\/div>