{"id":5618,"date":"2020-07-28T10:03:04","date_gmt":"2020-07-28T08:03:04","guid":{"rendered":"https:\/\/www.hbm.hu\/offer\/construction-of-a-series-of-bridges-near-debrecen-m35-motorway\/"},"modified":"2020-07-31T18:15:59","modified_gmt":"2020-07-31T16:15:59","slug":"construction-of-a-series-of-bridges-near-debrecen-m35-motorway","status":"publish","type":"avada_portfolio","link":"https:\/\/www.hbm.hu\/en\/offer-portfolio\/construction-of-a-series-of-bridges-near-debrecen-m35-motorway\/","title":{"rendered":"Construction of a series of bridges near Debrecen \u2013 M35 motorway"},"content":{"rendered":"
–<\/p>\n<\/div>
A project description:<\/p>\n
<\/p><\/h2><\/div>
The two-phase construction works of M35, a 24.1 km long 2×2 lane expressway between Debrecen and Beretty\u00f3\u00fajfalu providing continuation for M3 began in 2016. As part of the investment, between September 2016 and September 2017, we were involved in in a project with 16 bridges, including five long-span bridges and several continuous beam bridges, overpasses and combined game crossings.<\/p>\n<\/div>
Customer:<\/u><\/strong><\/p>\n Nemzeti Infrastrukt\u00fara Fejleszt\u0151 Zrt.<\/p>\n <\/p>\n<\/div> Contractor:<\/u><\/strong><\/p>\n Colas Hung\u00e1ria Zrt. \u00e9s a A-H\u00edd Zrt.<\/p>\n <\/p>\n <\/p>\n<\/div> Date of assignment:<\/u><\/strong><\/p>\n 2016.<\/p>\n <\/p>\n <\/p>\n<\/div> Applied technology:<\/u><\/strong><\/p>\n Bored pile supported by slurry; CFA pile foundation<\/p>\n <\/p>\n <\/p>\n<\/div><\/div><\/div> Related projects<\/p>\n <\/p><\/h2><\/div>