{"id":5612,"date":"2020-07-28T09:51:51","date_gmt":"2020-07-28T07:51:51","guid":{"rendered":"https:\/\/www.hbm.hu\/offer\/bridge-construction-above-the-koros-m44-koros-bridge\/"},"modified":"2020-07-31T18:15:47","modified_gmt":"2020-07-31T16:15:47","slug":"bridge-construction-above-the-koros-m44-koros-bridge","status":"publish","type":"avada_portfolio","link":"https:\/\/www.hbm.hu\/en\/offer-portfolio\/bridge-construction-above-the-koros-m44-koros-bridge\/","title":{"rendered":"Bridge construction above the K\u00f6r\u00f6s\u2013 M44 K\u00f6r\u00f6s Bridge"},"content":{"rendered":"
The construction of the 450-meter Berk\u00f3 Dezs\u0151 Bridge-crossing the H\u00e1rmas-K\u00f6r\u00f6s River at Kunszentm\u00e1rton was carried out in several stages. We started to work in February 2017 locating the test piles to the work area. Subsequently, in the second half of the year, our team constructed the intermediate piles. The piling works of the bridgeheads began in March 2018 and being repeatedly hampered by the river exiting its bed.. Our specialists were well-prepared to defend against record waves, and due to their fast response we could manage to return the K\u00f6r\u00f6s to the riverbed without any damage and kept piling at the planned schedule.<\/p>\n<\/div><\/div><\/div>
Customer:<\/u><\/strong><\/p>\n H\u00f3d\u00fat Kft. \u00e9s Duna Aszfalt Kft.<\/p>\n <\/p>\n<\/div> Contractor:<\/u><\/strong><\/p>\n A-H\u00edd Zrt.<\/p>\n <\/p>\n<\/div> Date of assignment:<\/u><\/strong><\/p>\n 2017-2018<\/p>\n <\/p>\n<\/div> Applied technology:<\/u><\/strong><\/p>\n Bored pile supported by slurry<\/p>\n <\/p>\n<\/div><\/div><\/div> Related projects<\/p><\/h2><\/div>