Project description:

During the seven decades following the end of the Second World War, only partial renovations and reconstructions were carried out on the Békéscsaba railway station that is why it was unable to fully and comfortably serve passengers. The aim of the comprehensive renovation -between 2013 and 2016- was to eliminate this situation. During the reconstruction works, we carried out the foundation of the railway station in more than 3 km length, while we also performed complex tasks related to earthworks, isolation, dewatering and structural engineering on site.

Customer:

MÁV Start Zrt.

 

Contractor:

FŐMTERV Mérnöki Tervező Zrt.

 

Date of assignment:

2016

 

Applied technology:

Pile foundation

 