Project Description
Project description:
In case of foundation works carried out in landscape protection areas, the most important aspect is the protection of the environment. It was our main goal, when we were asked to take part in a development project focusing on Natura 2000 areas around Lake Tisza in 2014. Our specialists were given the task of underpinning the Tiszafüred bridge carrying pedestrian and bicycle traffic. After a long preparatory phase, with the installation of pontoons and a pusher ship on site, and by using a 240-ton crane and the immediate removal of the generated waste, we completed the task in an environmentally friendly manner, in a short time.
Customer:
?
Contractor:
?
Date of assignment:
2014.
Applied technology:
Jet Grouting
Related projects
Rescue of archaeological remains during bridge construction – The new Tisza Bridge near Tiszapüspökibarvai2020-07-31T18:17:31+02:00
Five floors deep in the heart of the city – The Szervita Square Buildingbarvai2020-07-31T18:17:13+02:00
High board over the Danube – A giant diving board on Batthyány Squarebarvai2020-07-31T18:17:01+02:00
Landscape protection with modern civil engineering technologies – Lake Tiszabarvai2020-07-31T18:16:34+02:00
The bath is back to its old shape again – Palatinus Bath (historical monument reconstruction)barvai2020-07-31T18:16:11+02:00
Rescue of archaeological remains during bridge construction – The new Tisza Bridge near Tiszapüspökibarvai2020-07-31T18:17:31+02:00
Five floors deep in the heart of the city – The Szervita Square Buildingbarvai2020-07-31T18:17:13+02:00
High board over the Danube – A giant diving board on Batthyány Squarebarvai2020-07-31T18:17:01+02:00
Landscape protection with modern civil engineering technologies – Lake Tiszabarvai2020-07-31T18:16:34+02:00
The bath is back to its old shape again – Palatinus Bath (historical monument reconstruction)barvai2020-07-31T18:16:11+02:00
