A project description:

 

The two-phase construction works of M35, a 24.1 km long 2×2 lane expressway between Debrecen and Berettyóújfalu providing continuation for M3 began in 2016. As part of the investment, between September 2016 and September 2017, we were involved in in a project with 16 bridges, including five long-span bridges and several continuous beam bridges, overpasses and combined game crossings.

Customer:

Nemzeti Infrastruktúra Fejlesztő Zrt.

 

Contractor:

Colas Hungária Zrt. és a A-Híd Zrt.

 

 

Date of assignment:

2016.

 

 

Applied technology:

Bored pile supported by slurry; CFA pile foundation

 

 