A project description:
The two-phase construction works of M35, a 24.1 km long 2×2 lane expressway between Debrecen and Berettyóújfalu providing continuation for M3 began in 2016. As part of the investment, between September 2016 and September 2017, we were involved in in a project with 16 bridges, including five long-span bridges and several continuous beam bridges, overpasses and combined game crossings.
Customer:
Nemzeti Infrastruktúra Fejlesztő Zrt.
Contractor:
Colas Hungária Zrt. és a A-Híd Zrt.
Date of assignment:
2016.
Applied technology:
Bored pile supported by slurry; CFA pile foundation
Related projects
Rescue of archaeological remains during bridge construction – The new Tisza Bridge near Tiszapüspökibarvai2020-07-31T18:17:31+02:00
Five floors deep in the heart of the city – The Szervita Square Buildingbarvai2020-07-31T18:17:13+02:00
High board over the Danube – A giant diving board on Batthyány Squarebarvai2020-07-31T18:17:01+02:00
Landscape protection with modern civil engineering technologies – Lake Tiszabarvai2020-07-31T18:16:34+02:00
The bath is back to its old shape again – Palatinus Bath (historical monument reconstruction)barvai2020-07-31T18:16:11+02:00
Rescue of archaeological remains during bridge construction – The new Tisza Bridge near Tiszapüspökibarvai2020-07-31T18:17:31+02:00
Five floors deep in the heart of the city – The Szervita Square Buildingbarvai2020-07-31T18:17:13+02:00
High board over the Danube – A giant diving board on Batthyány Squarebarvai2020-07-31T18:17:01+02:00
Landscape protection with modern civil engineering technologies – Lake Tiszabarvai2020-07-31T18:16:34+02:00
The bath is back to its old shape again – Palatinus Bath (historical monument reconstruction)barvai2020-07-31T18:16:11+02:00